Perspective aviation complex tactical
aviation.
The content pages are based on a variety of aviation oriented sites,
technical specifications on the basis of published statements by Air
Force Commander, developers, aircraft, equipment and engines.
Go
to photo gallery T-50
The company "Sukhoi" is connected to the program of
flight tests
second PAK FA
Today in Komsomolsk - on - Amur, the first flight of the
second prototype fifth-generation aircraft. The
plane was piloted by test pilot honored the Russian Federation
Sergey Bogdan. The
aircraft spent in the air 44 minutes and landed on the runway
factory airfield. The
flight was successful, in full compliance with the flight plan. The
mission assessed the operation of the aircraft, the stability of the
power plant. The aircraft
performed well in all phases of the planned flight program.
Tests on the PAK FA program are in accordance with the
approved program. At
present, completed the preliminary set of ground and flight
operations, which involved all three prototypes, which were bench
strength tests, ground testing of fuel systems and other work. The
first flight of the PAK FA was held on 29 January 2010 in
Komsomolsk-on-Amur. Routine
tests flight model have been completed at the end of March. April
8 fighter first flight model and comprehensive ground stand, which
conducted testing of equipment and systems to support flight test
program, were brought into the territory of the flight test base
Sukhoi in Zhukovsky near Moscow. After
completing the required amount of preliminary tests on the stands of
systems and components, including static strength tests of the
sample, ground tests and aircraft flight model of the stand on April
29, began flying the aircraft on the program of preliminary tests.
In support of flight test program on the first flight model
done 36 flights (on March 12, 2011 T-50-1 flew more than 40 times,
including breaking the "sound barrier", T-50-2 made 4 flights).
sukhoi.org
June 1, 2009 "...
T-50 (QNA), T-50 (1), gliders are almost ready and are already in
final assembly, T-50 (0) too soon to send static"
December 4,
2009 "Currently
in my factory mastered the production of the" Russian stealth
"project PAK FA (promising complex tactical aviation) production
code T-50. The first aircraft, more aircraft have not yet, and CND
(full-scale integrated stand) is almost ready to commit jogging on
the GDP (the airfield that is). As soon as I got the opportunity to
see these things the product, so I climbed it. And fell in love with
it immediately. Aircraft
Su-27 family of course handsome. But the great T-50 is a step
forward. Size - less .
thrust, ie the ratio of "weight - traction engines" is huge. Factor
- 1.4. That is to say on this indicator it should fly like a rocket
without using the aerodynamic qualities. But aerodynamics - a
complete wing. And the mechanization of the wing - a unique.
lomaeetsa All and izgibaetstsa. Bays weapons - are enormous for this
size aircraft. Avionics albeit still crude, but because the best,
but we are every day working on it. It
will be a response to superdostoyny ... F-22 "Raptor". cunningly ...
opye Russian as always ... all at Bali. Let delayed for 8 years, but
we have made the 5th generation aircraft. take into account the
mistakes of others, have introduced the original design, and again
ahead of the rest will have some 20 years. As was the case with
F-15s (16) - Su-27 (MiG-29).Pictures, more pictures on the internet
many aircraft, but they are not exactly original. His photos. for
obvious reasons I can not put them there. But trust me - this birdie
just super. Six months. and it is sure to rise on the wing. A year
later, we are able to do so, at this point how much money "....
About the "arms-invisibility" clearly steeper than the F-22. 10
point suspension in closed bomboootsekah to 8, plus the ability to
install another 2 starter bars (at least the fixing points provided
for them) in violation of invisibility. Invisibility
in general there is no absolute. Thus,
the low profile. about
service - like all Russian equipment is serviced with a hammer,
half-drunk aircraft and ... banoy mother. The
joke of course, but without the warm water closet shall do.CFRP
course raises some doubts about the maintainability. in
which case it will change the whole panel. But
x ... NJ-war, and learn how to sculpt a patch. "
24/12/2009
The first jog
in Komsomolsk-on-Amur:
"... They brought it to the RD, the
preparation of 30 minutes, then started the engine, the aircraft
departed at the start (myself of course), the snake, turn on 360,
again a small snake, stop, podgazoval, jogging and checking the
brakes, turn to 360 in another side, 180 ° turn and drove back to
the taxiway, and then he was taken away altogether. In general,
everything was working and easy. Everything worked without fault and
went to 5 "
plane is not
painted.
04/01/2010
"... The aircraft to be painted" T- 50 (QNA ) is
colored gray, T-50 (1) has no color.
01/22/2010
"... The PAK FA made a fast jog with a
margin of nose landing gear and drag chute deployment.
When you look at it from afar, it seems slightly awkward
appearance. caudal part battened down, the beak is omitted. The
whole plane, where only thickening cabin. And even keel Achtung.
They are purely tapered, tilted and rotated to the same whole. When
you look not purely in profile or full face, a strange sensation.
the words to express complex. But in a short time will have to count
for today, was seen a few photographers and cameramen. capture the
historic moment. "
29/01/2010
Today at the airfield in Komsomolsk KnAAPO
Dzemgi-on-Amur at 11:19 local time, the maiden flight of the newest
Russian fighter T-50-1 created by the program I-21 / PAK-FA in KB to
them. Dry. The
flight lasted 47 minutes and ended successfully.
This first flight model - the T-50-1.
Before him was another T-50-0 (only case, strain gauges pasted
and vibration sensors, designed for static tests), which was taken
to Moscow in the summer or even spring.
There, in the Moscow, he should have been in every possible
way to load mechanically and, eventually, to break or smash.
Along with "nulevkoy" produced T-50 and T-SPS-50-1.
T-50-CNN - the so-called "full-scale Integrated Stand" (some
say "Land").
He eventually had to be fitted with a full complement of
equipment.
It would have worked out the interaction of all systems and it
is working out the technology works.
On it were set "screw up" details that could not be allow for
installation on the flight model. This
was saved a lot of money - because marriage is not thrown away, and
allowed to stand poyuzat.
In general, the first ANC was ready. At
first he rolled out of the hangar only at night, wrapped in a tarp
(for example, when you had to roll it into the shop for painting). The
engines also drove at night, so that the enemies have not noticed. True,
under floodlights, but it's stuff.
What finally took off - a T-50-1 - first flight model. It
is worth a minimum of equipment, just what is needed for the flight
+ BSA (system-board measurement, which measures the vibration,
bending, temperature, etc., a lot of sensors).
It so many wires and sensors, which wires staff equipment
simply is not enough space. This
is - one of the reasons that the first flight model does not install
all the standard equipment. But
the mass of the aircraft was a hair's breadth, as with the full
equipment, in place of the missing blocks are installed with the
appropriate weight loads.
He first ride on the strip at low speed. Then
performed a high-speed taxiing. After
that he traveled at high speed, driving the front wheel on a small
blackboard.
January 23 before lunch, he swept across the band took off the
front landing gear (6 seconds passed on the two main landing gear). After
lunch, repeated the trick, and on Monday at a meeting of the
methodical council decided that the aircraft ready to fly.
The flight was scheduled for Jan. 28, but due to a detected
malfunction in the flight control system was postponed for one day. During
the night this malfunction, and at 11:15 January 29 appointed its
first flight.
the side of the band depends on the helicopter with a
cameraman, flew the Su-27UB, too, with the cinematographer, has made
"box", and when he began to pass along the strip, the first flight
began to gain speed, pulled away from the band, and began to climb. And,
in the sky he had gone nearly a candle. Against
the background of the Su-27UB, he looked very
inconspicuous.Literally - as a dark dash at a distance of three -
four kilometers.
After takeoff, the machine turned over his left shoulder and
went to the North - most of the test flight took place over the
taiga.
Returning after half an hour, the cars were at a low speed at
an altitude of about 30 meters above the strip, made a box and
T-50-1 landed. Su-27UB
landing shot, and then landed his.
During the flight failures of the equipment was not.
more scheduled flights to Komsomolsk 7, and then he was taken
away along with KNSom in Zhukovsky.
12/02/2010
The second
test flight of the first flight model T-50 was made on Friday,
February 12, at the aerodrome of Komsomolsk-on-Amur Aircraft
Production Association (KnAAPO). The
air fighter stayed 57 minutes.
Before the
second flight of the T-50 was painted in the colors of the Air Force
Russia - gray and white camouflage broken.
15/02/2010
The third
test flight of a new fifth-generation fighter was held on Monday,
Feb. 15, at the airport of Komsomolsk-on-Amur Aircraft Production
Association.
After the
flight procedure started dismantling the aircraft. Probably
further testing machines continue to LII. Gromov,
Zhukovsky
24/02/2010
It is necessary to finalize the middle of
March. Wings and not
detached. Further
development of avionics. Then
another flight will be 4 of them before sending in Zhukovsky. And
there should dvoechka catch up.
03/01/2010
On Monday, Putin paid a visit to the "Sukhoi",
where he studied
with progress in the fifth generation
aircraft.
The head of the OKB Mikhail Pogosyan has
demonstrated Putin work of the special booth, where the operation is
modeled elektrogidroprivodom aircraft in conjunction with the work
management system fighting machine. According
to Pogosyan, the aircraft drive system is distinguished by high
reliability, and even when the equipment of a shift function allows
the machine control to other governments. In
the airplane is not fully mechanical operation - all the work for
pilots makes 'smart' integrated management system, according to
ITAR-TASS. In this case,
said Pogosyan, due to new technology system weight is reduced by 30
percent over previous models.
Poghosyan presented to Putin honored test pilot Sergei Bogdan
Russia, which first took off a fifth-generation aircraft. Putin
has congratulated the pilot and asked him about sensations during
the flight. The tester
said that three times already raised a fighting machine in the air,
and the results obtained in the course of working out at the booth
at the Sukhoi Design Bureau, will avoid surprises during the actual
flight.
The Prime Minister also showed footage of various castings of
the aircraft, including engines, as well as long-term safety of
aviation complex tactical aircraft. Pogosyan
said that during the first flights have been tested and achieved
angles of heel angle of attack of 27 degrees. In
tests of the Su-27 could achieve such results in just a few months
after the first machine rose into the air.
25/03/2010
03/26/2010
Flying
T-50-1. Total in
Komsomolsk-on-Amur were more than six flights.
04/08/2010
Fifth-generation fighter was delivered
to the Zhukovsky to continue the program ground and flight tests
Today from Komsomolsk-na-Amur in the
military transport plane AN-Russian Air Force 124 "Ruslan" at the
airport Flight Research Institute. Gromov
in Zhukovsky near Moscow, was taken first flight model aviation
complex of the fifth generation (PAK FA), as well as comprehensive
land stand on which is carried out testing of equipment and systems
to support flight test program.
After building the fighter company "Dry" will continue to late
April - early May flight tests. On
the stand will be integrated testing of systems and equipment ...
29/04/2010
... Later, exactly three months after the
first flight in Komsomolsk-on-Amur, a prototype fifth-generation
fighter T-50 first flew in the suburban sky. Taking
off from the airfield LII. MMGromov
was held at 12.46, before it rose into the air support aircraft
Su-24M. After spending 39
minutes in the air, the machine has successfully landed a 13.25 on
the runway at Zhukovsky. The
plane was piloted by test pilot honored Sukhoi test pilot Sergei
Bogdan Russia.
14/05/2010
On Friday, May 14, 2010, the first flying
prototype fifth-generation fighter the PAK FA (T50-1) made his
second flight from the airfield LII. MM Gromov
in Zhukovsky pomoskovnom. The
flight lasted 1 hour and 10 minutes and passed without comment, all
aircraft systems were working normally. Piloted
vehicle test pilot of "Sukhoi" honored test pilot Sergei Bogdan
Russia.
"Rise"
----------
CHIEF DESIGNER PAK FA TOLD ABOUT THE
FIGHTER
In response to a request by journalists
to compare the PAK FA fighter with an American F-22 Raptor, was
created ten years ago, the chief designer of the aircraft, Alexander
Davydenko said: "The main functions are the same, but we tried to
make them better." Davydenko
said that the development of aircraft KB "dry" modeled dogfight
T-50, F-22.
"I think we will have competitive prices. As
for the criterion value / effectiveness of our aircraft are much
better, "added the designer.
Prototypes fourth-generation fighters of the MiG-29 and Su-27
took off in 1977. Analysts
say a number of countries, including Libya and Vietnam have
expressed interest in acquiring Russian fifth generation fighter,
but serious financial, technical and even political barriers will be
saved, before Russia will establish serial production of these
machines.
The first flight of the PAK FA has shown that " Russia remains
firmly in second place in the world in terms of defense technology,
"said a recent review of the Moscow-based Center for Analysis of
Strategies and Technologies (CAST), published last week.
"2015 is set as the deadline for the supply of fighters Air
Force. We are working on
implementing this task, "said Davydenko. According
to him, the prototype, which flew a "100% machine of the fifth
generation." The designer
said that the system of navigation, communication and information
system for experimental all-new design, but their tests in the wind
regime is later. The
aircraft is not ready for the suspension arms, said Davydenko.
The share of composite materials in the
mass of the empty aircraft is 25%. On
the surface of the aircraft - 70% ", - said A. Davydenko on Monday.
He noted that the widespread use of composite materials in
aircraft design can reduce its mass, and also significantly
facilitate the preparation of mass production. "Through the use of
composite materials significantly decreased the amount of detail :
compared with the Su-27 decreased the number of parts is four times
", - said Davidenko.
He added that the use of composites will significantly reduce
the radar visibility of the aircraft.
Davidenko said that the fourth-generation aircraft - the
Russian Su-27 or American F-15 - are the surface reflection
coefficient, which characterizes the radar visibility of the
aircraft, within 12 square meters.
"In the F-22 (U.S. fifth generation fighter - IF-AVN) -
0.3-0.4 meters We have
similar requirements for visibility, "- said Davidenko.
Analysts believe that the existing engines of the prototype
T-50 did not have all the capabilities of power plants of the fifth
generation. According to CAST, "though, these engines provide the
necessary total power (enough to reach even supersonic cruising
speed), but do not meet the requirements of the fifth generation of
the ratio of weight and thrust, and fuel savings. "Also CAST
concludes that" many observers are skeptical about Russia's chances
to build this engine of the fifth generation, which could compete
with American Pratt & Whitney F119 ". There are also problems with
the development of new radar and other onboard equipment, but recent
progress shows that the risks are reasonable.
Davydenko said that T-50 will be issued on a parity basis (50
to 50) in the Russian-Indian joint venture and can be equipped with
a supersonic cruise missile BrahMos.
Analysts have concluded that a Russian stealth fighter could
easily take a third of the world market, if a large-scale production
becomes a reality.
Asked about the possible involvement of China in the PAK FA
project, Davydenko said that "no talks with the Chinese on the
fighter not being. "
-------------
"To bring some clarity to the debate
above. Happened to be there yesterday, listening to Putin for 10
minutes (introductory report to the meeting), then Pogosyan
(answering questions after the meeting and the 5th generation in
general, and it was after 23.00!) and before the arrival of GDP (it
came only at 19.00), during the "tour" - including the chief
designer Davidenko. Based on all this, here is what he heard some
media representatives, by virtue of their abilities and
understanding of the issue and presented about three summers PAKFy,
about PAKDu, which will supposedly make dry, dry about 350 to 2020,
etc., etc. Do not beat them severely for it - they also had to
protorchat Dry with almost 14.30 to 24.00, while they as they
usually tried to pass "before the other" (work such as this.)
What really showed (before the arrival of GDP):
1. Stand KSU-50 drives with the field (Bogdan attended, said
of April)
2. seminatural stand avionics with real cubicle (clarify -
cabin "real" as the 50-1, well, if only the exception of some ACA,
etc.)
3. Halls Design (gl.konstr. Davidenko answered questions,
mainly silly, on the screen - Including power circuit design-wing,
etc.)
4. Department of the strength and the like simulation
(on-screen images of "digital" test wing airframe as a whole, in
memory / h on foreign objects, refueling - to avoid contact with the
fuel hose out of a / s, etc., etc.)
in the article. hall, where stands 50-0, drove only a couple
of cameras and GDP + staff fotik Sukhovsky (but its pictures, which
came 50-0, has not yet given, like "No way", although still pictures
RTR and NTV has already seen).
Next "in essence" (the way Sukhovskaya corporate magazine
called), very briefly, on those issues on which there broke a lot of
copies.
1. 50-2 forward towards the end of the year. 3 and 4 - in
2011.
2. radars 1 and 2 of course and no plan (IAP was very angry at
the fools zhurnalyugi done on the basis of this far-reaching
conclusions). We look forward to her on board in 2011. back and do
not wait, because "we do not need it"
3. engine of the second stage are not waiting until 2020.
"Engine of the first stage satisfies all of the TTT, in t . h. by
supersonic cruising "with him and go into serial 2015-2016. Again,
very angry at zhurnalyugi who believe the first stage engine is" old
"(because as a brand new FADEC, the new turbine, the thrust," 2500
kg ", weight and less consumption, etc., etc.).
4. ESR. It was said so: the 4th generation ("Su-27") - about
12 meters, the F-22 - about 0.3 ... 0.4. And we will have "no worse
than the F-22s or so,"
5. We look forward to in Zhukovsky "in the next few months"
(April - see above), there will be a presentation, but "must as long
as keep the intrigue "
Andrey Fomin ( AF)
----------
- Began the program in
2002, and in 2004 Putin first saw the layout in 2005 started a real
funding
- the end of 2010 are planning to do 2d, at 2011 - 3rd and 4th
T-50
- already the first two T-50 equipped with a regular display
and navigation systems, their will have on aerodynamics first /
strength / manageability, build loyalty, support the airframe
- to 3rd and 4th place will be other avionics, including radar,
weapon systems
- on the 1st stage engine izd.117 put interim, from 2011 are
going to start work on the engine to the 2nd stage
- 12:48 shown large landing gear
- may be turning a flat nozzle
- PAK FA initially multipurpose, work on air / land / water
(unlike the F-22)
- the price declared, "is 2-3 times less than the F-22"
(verbatim quote from Putin
)
- plans to later make a spark (probably when the Indians begin
to work closer)
- initially in the TTZ inherent superiority over the F-22,
which is logical given the large margin of time in the development
of T-50
- a powerful system of REB, infrared sensors, long-range
missiles
- built-in monitoring system to reduce the cost of care
- in the glider PAK FA is not less than 30% of composites,
because it significantly reduced the total number of items (4 times
less than Su-27)
- the signature of the FA PA 24:30 minute
- by 2012. the
results of tests first 4 prototype will determine the size of the
initial batch
- to test the initial batch will end in 2014, 2015, from 2016
to go into mass production (will buy the first phase by 2020. more
than 50 aircraft - a quotation from Popovkin)
----------
Analysis of T-50
Side view of 27.3 m
Top view of 116.34 sq. m.
Front view of 8.96 m
The volume of the airframe 122 cubic meters
The area of the carrier 80 m
Maximum takeoff weight 33,320 kg
Weight is normal, 50% of fuel 23400 kg
Weight is normal, 100% fuel 27 280 kg
Empty weight 15500 kg
Weight 8700 kg of fuel (100%) / 5000 kg (57%)
Loading weight 4220 kg (8 AB-500 + 2 R-73 inside
2780 kg (2 P-DB 1400 kg, 2 AAA 200 kg
4 P-SD 760 kg, 4 AAA 200 kg, 2 P MD 220 kg)
9020 kg (4 AB-500, 2000 kg + 2 P-73, 220 kg within
2 PTB 2800 kg, 8 AB-500 4000 kg)
External load units - 6 pieces, interior - 6 pieces.
The total volume of compartments - 8 cubic meters
The relative volume - 13%
Weight universal vnutrifyuzelyazhnoy catapult installation
UVKU-50L is taken as 100 kg, weight UVKU-50U - 200 kg.
Weight 8700 kg Fuel (total), 5000 kg (normal)
2 PTB-2000 2 x 1570 kg = 3140 kg of fuel, the total weight of
8700 kg + 3140 kg = 11 840 kg
Maximum speed
2200 - 2500 km / h
Speed mode
to bezforsazhnom 1850 - 2100 km / h
In the
aircraft hydraulic system is used with a working pressure of 350 kg
/ kv.s
The valves
are opened electrically central compartment, side - hydraulic.
Radar station
Interview with the CEO NIIP them. VV Yuri
Tikhomirov White
excerpt articles from the magazine "Flight" № November 2008.
Finally, we
come to the most important thing - the work of AFAR. Just
over a year ago, at MAKS-2007, were first shown in full-scale
prototypes of active fragments of the lattice design faziovannyh
NIIP. As you know, your
institution is a leading developer of electronic systems AFAR for
the fifth generation aircraft, as developing this work?
works are on schedule, under a contract that we signed with
the company "Sukhoi". According
to this schedule in November, the first full-size fully equipped
two-way modules and customized AFAR will be put on the stand for
docking station with the other blocks. Today
the first antenna is completely assembled, equipped and handed over
to the setting. Full
production transceiver modules based on monolithic chips in NPP "Istok",
is a complete set of the second sample and started picking parts and
modules of the third sample. Thus
today we have in production for three antennas. They
will consistently go to trial - the first, as I said, in November,
the second - in March or April next year, etc. The
very next year will be installed on AFAR one of the planes
generation, which are currently under construction at KnAAPO, and in
2010 to begin working off her flight. At
present, we can confidently say that all the technical problems of
design and manufacture of transceiver modules overcome. Now
decide on the antenna as a whole - to cool, conjugation, beam
control, but, I repeat, everything is moving in accordance with the
approved schedule. As the
tests will gradually build up the complex - first on the stands,
then on airplanes, in the end - come to fully under teh.zadaniem
set.
How long will it be necessary for the entire test cycle and
dovodok AFAR?
As you know, the development of modern radar is typically 5 -
7 years. Therefore, if we
take as the reference current in 2008, when the actual testing of
equipment, we can assume that our system will be fully ready for
operation around 2014 - 2015. A
similar situation abroad, even in the F-22, which is quite a long
time adopted for use, not all modes AFAR finally worked out. In
this regard, it should be noted that the NIIP them. VV Tikhomirov
has extensive experience in phased array antennas. The
Americans in their time to skip the passive phased array - moving
from slot arrays directly to AFAR. We
also have extensive experience in the area of PAR, which has been
around 40 years (and we argue that AFAR is different from the
passive phased array technology is essentially only the execution of
the radiators, and the rest of the mathematical modeling and
machine, we take from our already well established PAR) that gives
us great advantages, including and
in terms of refinement. We
have such studies for PAR, which no one else in the world
you probably follow the work of AFAR, maintained and abroad,
and in our country. Can
you name some features of your project relative to others, I use it?
Well, Americans compare quite difficult, because the real
(rather than advertising), very little information, and can only be
judged for some telltale signs. But
we believe that the characteristics laid down and sell at least not
inferior, but in fact in some ways superior to those possessed by,
for example, radar AFAR with the F-22 and F-35. As
for the work performed by other domestic developers radar, the main
difference lies in technology. We
focus on the most modern technology now in the world of monolithic
microwave circuits, while our domestic colleagues use the so-called
hybrid technology, from which, for example, in Europe have refused
(apparently meaning the radar "Zhuk-AE from" Fazatrona " , for the
MiG-35 - paralay). As we Americans build their AFAR on monolithic
chips, with the prospect of increasing their degree of integration
and transition into the future on what is called "intelligent skin"
- ie, two-way modules can be anywhere in the aircraft, creating the
necessary radiation field. Thus, we are on the main global
development path AFAR.
Can we say that technology obtained from AFAR development
under this program will later be used to build radar for other
aircraft and in general - other models of equipment?
course. For example, sooner or later the question may arise to
develop a new lung or fifth-generation fighter aircraft equipped
with modernized AFAR generation "4 +", "4 + +", etc. And in this
case, Instead of again "reinvent the wheel", it is better to use the
technology already spent, while allowing the download of production
(because the larger the scale of production of the
receiving-transmitting modules, the less their cost). The problem in
this case reduces simply to scale all those same technology and
equipment will remain, and will only need to reduce the diameter of
the antenna. This is not a scientific problem, but a purely
structural and technological. Next. already utilized in the
manufacture of two-way modules can be used in radar, for example,
anti-aircraft missile systems. So that the more applications we find
technologies already spent - so much the better. After all, if
before we had a problem and create a "roll out" production, now may
be the reverse situation: the power of "untwisted" and the
consumption is low. Only in a good production load the cost of the
modules may be acceptable.
And what is your vision - in the future will be a place for
both directions of the FAS (both active and passive), or with the
development of AFAR line of passive phased array will be forgotten?
I believe that, at least in the foreseeable future, its place
will be to have it both directions. AFAR will supplant conventional
phased array only if its component base will become very cheap. In
the meantime, even in conditions of mass production at the current
level of technology, the cost of AFAR and PAR is different at times.
So that the passive phased array is too early to go down in history.
----------
ODC will develop a new engine for the
fighter of the 5th generation
The development of long-term engine for fifth-generation
fighter will engage United Engine Corporation (JDC). Such
a statement after the meeting chaired by Vladimir Putin made the
head of the corporation "Sukhoi" Mikhail Pogosyan, RBC reports.
According to him, "the engine of the second stage integrator
for long-term set of tactical aircraft, is likely to become united
Engine Corporation, which merged with the company" Salute. "
Pogosyan said that already "defined the contours of the engine
of the second stage," but added that his cycle of creation will take
10-12 years.
According to the head, "Dry", the new fighter, "took off with
a new engine that was designed specifically for this aircraft. "He
noted that" this modern development, that allow the operation of the
aircraft for a long time. "
The engine
cut out of the magazine "Flight" № 12/2005.
Answering the
question of "ups", Victor Chepkin suggested that similar engines
(izd.117S), most likely, will be equipped with the first prototypes
promising fighter T-50, currently being developed by "dry" in the
program Future Aviation Complex tactical aircraft (PAK FA). And
for future serial fifth generation fighter "Saturn" brand new engine
designs generation "5 +", which will differ even higher performance,
in particular, have lower specific gravity, which, according to
Victor Chepkina is the main criterion for distinguishing each
subsequent TRD generation from the previous one. For
the current batch of AL-31F engines that index (the ratio of weight
to pull the engine) is about 0.12. at
"117C product", he is reduced to about 0.10, and for the next
generation will be to reduce the proportion of approximately 0.8. (AF) ...
For the flight tests are prepared two engines that are already
installed on the aircraft (aircraft with tail number 710 is made
specifically to AMIC "dry" for testing the new engine), and
another backup drive. In
addition, the "Saturn" made 26 experimental samples of the engine
type AL-41F (izd.20, built under the program MFI, about 20 tons of
thrust), which are involved in a program of ground tests. The
test program first phase includes 35 flights, after which engines
will be returned to the "Saturn" to study, then the test will
continue. The entire
program is designed for 3 years and provides for approximately 650
flights. Since 1993, when
the development of AL-41F engine, in this program 90 million dollars
invested own funds. The
entire program is estimated tuning the engine at 350 million
dollars. Some 200 million
dollars needed for development of its production.The funds for this
"Saturn" earns exports of aircraft grade "Su", in which the costs
are approximately 25% of engines. Developing
a new engine on the "Saturn" is in two directions. The
first involves a deep modernization of the AL-31F engine option in
AL-31B (interchangeable) with the introduction of technologies of
the 5th generation. This
engine with increased thrust is proposed to be installed on any
aircraft Su-27 Su-30 Su-33. As
V. Chepkin, this is a commercial project aimed at modernization, as
the Russian Air Force, Air Force and foreign countries, and upgrades
can be carried out in the repair of aircraft. The
second trend - the creation of the engine AL-41F1, which has
fundamental differences in the design of the compressor, turbine,
Automation and other sites. In
particular, compared with the AL-31F engine, Al-41F1 150-kg lighter
and has increased by 20% thrust. According
to the plans of AMIC "Sukhoi" aircraft of the 5th generation to
complete certification in 2010. ...
Today, this engine is undergoing flight tests, then we can talk
about advance the program to create a new aircraft. And
it inspires certain optimism. Of
course, we here do not work alone, our partner - Ufa Engine
Industrial Association.Already produced five prototype engines, and
they are tested on the flying laboratory Sukhoi Design Bureau. I
want to say that the results obtained in the stands and in the air,
we were completely satisfied. Thus,
the engine of so-called first phase of creating the schedule, and if
the fighter of 5th generation of flies, as stated by Air Force
Commander Vladimir Mikhailov, in 2007, it will be equipped with our
engine - the turbine high-performance analog and digital control
system. Its share will
increase, and increase traction. As
for the second phase of the engine, it will have a brand new design
look. In particular, he
will get a fan with an increased flow of air into the combustion
chamber and a new digital control system, which will increase the
thrust reverser system and vserakursnogo and thrust vector control. Objectives
of both phases - increase thrust aircraft engines, to lift his life
to make it available, and hence reduce costs throughout the product
life cycle. This is
especially important.
R145-300 engine
Alternatively, the AL-41F1 can be installed a new engine R145M-300
with a thrust of about 16,000 kgs. This
motor is a continuation of the P-79 (Yak-141), P-179-300. "...
Today, the arsenal of the" Union "is a new development. This motor
driven bypass ratio. Specific gravity - 0.09 ... Inside the
afterburner camera placed in a device that is able to completely
block the visibility of turbines from the rear hemisphere.
Naturally, the loss is taken into account when calculating the
pleasure of the engine. ... There is one feature of the engine - the
rotors rotate in opposite directions to minimize the gyroscopic
moment, which is important for single-engine aircraft ... The
specific thrust of the new engine the "Union" on the afterburner by
18% (~ 14 750 kg) more than the Al-31F, and the besforsazhny modes -
35% (~ 10500kgs) above. And its weight and dimensions allow us to
consider questions remotorizatsii aircraft Su-27 family. "
Excerpts from the explanatory notes to the annual report
AMNTK of "Union" in 2002.
In 2002, OAO AMNTK "Union" at the expense of equity and debt
the following services: I. By
krupnrazmernoy topics: 1. Tests
on the stands of CIAM: 1.1
Experimental verification of the performance level of the fan and
the test report on the stand UV11. 2. Tests
on the stands AMNTK "Union": 02.01
Flushing nozzle models with an alternative way of deviation of the
thrust vector (with respect to the engine R145-300. 3.
In the production: Production
of 3.1 parts fan motor R145-300. 3.2
of relating to the preparation of exhibits for participation in
exhibitions. 4. In RCC: 4.1
The design study of R145-300 engine in preparation for the
competition. 4.2
Estimated study options with the organization of the afterburner
combustion in carburetted fuel gas mixture. 4.3
Calculated gas-dynamic study of the fan in 3 stages of compression. 4.4
Design study of a flat nozzle with a self-running scheme part. 4.5
Preparation of materials for the competition on engines R126M-300
and P133-300. 4.6
passports Export image on the engines and R179-300 R145-300. 4.7
Study Project R145M-300 primarily from the perspective of the
consumer characteristics that determine the layout of the aircraft,
its flight characteristics, the level of visibility. 4.8
Preparation of technological advance on the engine of the 5th
generation. 4.9 to
develop a range of gas turbine power plants, which are of AMNTK
"Union" can prepare on the basis of its aircraft engine development.
-----------------
"... In the inner compartment can be
located as a fighter missiles air-to-air and air-to-surface. In
air-to-air missile is a long and short-range and medium-range
missile development design office "Pennant."
originally planned equipping aircraft missiles air-to-air
long-range development of the design bureau "Innovator", but on
results of the contests were decided in favor of the product
development of the "Corporation" Tactical Missiles. "
In a class "air- surface "in the inner compartment can be
placed anti-ship missiles, rockets modular general-purpose bombs and
guided the caliber of 250 kg. In
addition the aircraft can carry guided missiles and bombs of various
caliber destination up to 1,500 kg on external sling.
All managed air attack, planned to equip the aircraft,
developed corporation "Tactical Missiles."
Military-Industrial Courier
Based on materials from the report of the designer of "State
of ICD" Vympel "them. II Toropov,
"GA Sokolowski at the
Jubilee Scientific Conference "Air system in the XXI century".
"In
accordance with the arms of Russia" Vympel "is developing advanced
products of class" air-to-air "light, medium and long range with the
phased build-up their combat performance fighter aircraft to equip
the 5th generation. High
performance tactical perspective products will ensure sustainable
advantage in air combat aircraft of the 5th generation of aircraft
JSF, F-22, EFA.Structural study of promising products is carried out
in accordance with their domestic accommodation, which is carried
out for the first time on Russian fighter "- the report said.
In the area of short-range weapons, according to a report,
work is underway to upgrade the family of R-73. The
immediate future - ed. 760,
the so-called "Stage 2 upgrade." The
characteristics of the rocket built up by equipping its combined
system of governance in the TGS, the inertial system (MIS) and
receiver lines radiokorrektsii. Capture
of the target can be after the start of target designation from the
ISU. The transverse size
of the rocket 320 x 320 mm. It
is able to capture the target in track and when you start to make a
turn at 160 degrees. Ed. 760
ready for testing and can be put into production in 2010. In
2006, JSC "IBC" Spark "was engaged in preliminary design engine
516-74M2 missiles for the IM.
It is almost a new short-range missiles, highly maneuverable
short-range air combat and missile defense, received the designation
K-MD (ed. 300). It is designed as a weapon to TTX superior
characteristics such as foreign promising prototypes ASRAAM and
Sidewinder-9X. missile is equipped with a matrix of TGS with the
possibility of pattern recognition and high-range double capture.
Engine with dual-mode operating time of 100 seconds and
three-channel device, a gas-dynamic control (K-74 - four-channel).
Completion work is expected by 2013.
In the field of medium-range weapons are the modernization of
F-77. The first improved version of the product launch was 170-1.
The next stage of modernization - Vol. 180. Lattice handlebars will
be replaced with flat handlebars neskladyvayuschiesya. The rocket is
planned to equip the new multi-mode active-passive CSG. Passive mode
will allow direct SD on noise sources and emitting radar of enemy
aircraft. launch range will increase by 2 - 3.5 times. The missile
could be ready by 2010. 542U Delivery Engine for LCI rocket 180 in
2006
a separate line development of RSD family ed. 170 is the
creation of Ed. PD 180 Long Range - initiative project. In 2006,
preparing the technical design for the rocket engine 371 of the
180-PD.
In the field of long-range weapons "Vympel" is working on
upgrading the R-37. Within the pilot project on a competitive basis
based on ed. 610M developing new ed. 810. This rocket should be
placed in the inner compartments. Range increased by 1.5 times,
target altitude of 40 km. Hours Unit - 360 sec. In service in 2013 . .....
On its stand MRI "Agat", part of Air Defense Concern "Almaz-Antey",
put the new active radar homing (ARGS) 9B-1103M diameter of 350 mm
and 150 mm, as well as serial ARGS missiles RVV- AE. 9B-1103M head
with a diameter of 150 mm rockets designed for small caliber and
enables the capture of target-class "fighter" at a distance of 13
km. As the general director - general designer of MRI, "Agate"
Joseph Akopian, its characteristics and the weight and size indexes
this ARGS competitive with infrared homing devices, which are used
in rockets melee and short range. Infrared heads, unlike radar, is
not suited for use in all weather conditions. Until now there has
not been technically possible to build an active head of such
dimensions - is the latest achievement years. As noted by Joseph
Hakobyan, according to the magazine Jan `s, 9B-1103M-150 - The
smallest radar head of all. It belongs to the fifth generation of
devices - active radar seeker is fully digital, switching to" figure
"is performed at the first intermediate frequency. Warm-up time
after the head provisional inclusion in the heating transmitter is
only one second, which is achieved by using fiber-optic gyroscopes,
which do not spin. 9B-1103M head-350 is designed for long-range
missiles - it enables the capture of targets at a distance of 40 km.
All 9B-1103M head (there is also active radar seeker with a diameter
of 200 mm, is not represented in Berlin), can be used in rockets
"air-air" and the rockets' surface-to-air. "According to Joseph
Hakobyan, gradually the country, which are now satisfied with
performance RVV-AE, or AIM-120 (AMRAM), will move to a new
generation of missiles and the heads of such series 9B-1103M. Developed
two unified vnutrifyuzelyazhnyh ejection device: UVKU-50L missiles
to a maximum weight of 300 kg and UVKU-50U - 700 kg.
"Sibur - Russian Tyres"
developed tires for a fifth generation fighter
Holding "Sibur - Russian Tyres" under contract with the "Sukhoi"
has developed a new tire for a multifunctional fifth generation
fighter. This was
reported in the press service of the company.
January 29, 2010 entered the history of Russian aviation as a
special day, made its first flight multifunctional fifth
generation fighter T-50 (design name). At
the same time the plane began a process of flight testing of the new
state of aviation tires 1050h365-508 modes. 1A,
developed by holding "Sibur - Russian Tyres" in the framework of the
agreement with JSC "Sukhoi".
multifunctional design a fifth generation fighter "Sukhoi" was
carried out in close cooperation with many professionals in all
sectors of the domestic industry, including the design bureau of
"Yaroslavl Tyre Plant", which is the holding company "Sibur -
Russian Tyres."
Holding "Sibur - Russian Tyres' is a major manufacturer of
aircraft tires Russian, its share in total production of over 60%. The
range of products - tires for civil aviation, military aircraft and
special purpose tire. Holding
has the country's only specialized design bureau to develop aircraft
tires, which created 95% of the domestic aircraft tires.
Under the agreement with JSC "Sukhoi" project was developed
tires, held pre-production, and worked construction, preliminary
testing of a new bus 1050h365-508 mod . 1A,
intended for the main landing gear facility T-50. The
design of the tire on the load and its speed performance is fully
consistent with the requirements of the fifth generation
multipurpose fighter based on the stocks of its further development.
www.aviaport.ru
-------------
article for the magazine "Pop ulyarnaya
Mechanics ": PAK
FA on the threshold of release
The development of the PAK FA project:
1998
Russian Air
Force was given the tactical and technical requirements (TTZ), a
light multipurpose aircraft front (LFS). On
the role of LFS projects could apply for C-56, MiG 1.27 and the
MiG-29M3 or the new project a light fighter with an engine AL-41F
(izd.20) Lightweight
front-line aircraft was seen as a cheap addition to the IFIs. SFI
(average fighter.) plane
as called middle class, with two motors afterburning thrust of
18,000 kg. Written
justification and specification.The purpose - the preservation
characteristics at reduced takeoff weight (compared to the Su-27)
due to reduced mass-dimensional characteristics of the avionics and
engines of high specific parameters. Probably
in a class of F/A-18E/F. On
assurances of management Sukhoi SFI one is able to meet the
challenges of MFIs and PRL, as a result were finally closed topic
Mikoyan design bureau 1.42 and 4.12. In
CB "Dry" project is known by the nickname "Ushastik." 1999.
The official
beginning of work on the T-50 - fighter of 5th generation (combat
aircraft the next generation of I-21). ...
The next step was to clarify at the end of 2000 ended a promising
group of FA. In
connection with this topic for a while sounded like "the average
frontline fighter" (SFI).04.2001
Air Force
specified the requirements for prospective aviation complex tactical
aircraft (PAK FA).As far as the Air Force needs about 300 fighters
(optimistically - 600). Apparently,
the revision of the TTZ was the result of failure of a heavy fighter
(IFI program), which led to the unification of those MFIs and LFS in
one. Known data on the
new machine DB-soo was to take place between the I-90 (1.42) and PRL
(Mikoyan Project 80's 412) and have a normal take-off weight,
according to the preliminary design of 23 tons. In
the creation PAK FA is supposed to allocate half a billion dollars. From
the beginning, this amount is in doubt. In
Irkutsk APO believe that the program actually creating
fifth-generation aircraft to 2.5-3 billion U.S. Representative AMIC
"Dry" said the translation work on the C-37 from the stage of an
experimental model in the stage production will require about 10
billion . U.S. $ purchasing price of a machine (external market) is
likely to be commensurate with the price of the F-35 and make about
80 million dollars.
RAC "MiG"
presented at the preliminary design competition fighter, known as
the symbol of E-72, with two promising engines of the firm "Klimov"
in class 10 000 kgf thrust, on
the aerodynamic configuration is an extension of the scheme
aircraft, "1.44", but in the last measured, the most severe
modifications of MiG-29
- PAK FA, 2000 - 2003 g, he won the competition pilot project
in 2002. As a result of
work increased takeoff weight and flight, respectively, were reduced
data. Probably occurred
as a result of failure of a vertical landing variant. Yakovlev
announced the temporary suspension of its participation in the
project, due to changes in requirements for the complex of the
customer.Short takeoff and vertical landing will be implemented
later. 2003
Chief
designer of aircraft T-50 - AN Davidenko (in 2004). Successfully
carried out the protection of preliminary design of the new fighter,
began experiments on flying laboratories.
As of 2004 the project maximum takeoff weight of T-50 reached
35 tons:
India's Sukhoi Design Bureau offers a joint development of
fifth generation fighter with a maximum weight of 35 - 40 tons. (T-50
and / or Su-27BM?)
article from the magazine "Flight" № 12 / 2005.
"dry" concept unveiled T-50, but received no support Indian
minister.
In late November of "Aviation Holding Company" Sukhoi "and
JSC" Sukhoi "on his official website (www.sukhoi.org) placed in the
public domain and sent to the media and news agencies annual reports
on its activities in 2004 In addition to financial, economic and
statistical data on both the joint-stock companies in the past year,
the annual report provides an overview of the major programs that
have been realized AHK "Dry" and "Sukhoi" in 2004 and continuing
into this year. In
particular, the first provides an overview of the main promising
military program "Dry" - program for the development of perspective
aviation complex tactical aircraft (PAK FA), which has also the name
of I-21 and plant the T-50 (both of those names are published by
"dry" for the first time officially .)
The annual report of JSC "Sukhoi" states that it "is
developing a long-term aviation system T-50, which continues the
line of battle and tactical aircraft designed as to equip the
Russian Air Force and for export. The
new complex is created by using proven technologies and
modernization of aircraft of the Su-27 weapons. " In
the accompanying materials indicated that the development of fifth
generation fighter T-50 is in the "Sukhoi" since 1999, chief
designer of the project is the AIDavidenko. The
annual report of OAO "AHK" Sukhoi "provides an overview of concepts
and the development of" front-line fighter of the fifth generation
of I-21. " States, inter
alia, that "the strategic plans of the company" Dry "in the field of
combat aircraft associated with the development and creation of
front-line fighter of the fifth generation. Task
of building the fifth generation fighter aircraft are defined in the
current state armament program. Holding
"Dry" is the parent company to develop a new fighter. The
Report highlights the concept created by the aircraft. Among
them:
-Versatility
- the ability to successfully engage both air and ground and naval
targets, includingsmall-sized and mobile, all-weather and time of
day, in terms of enemy precision weapons
, maneuverability - can make controlled flight at low speeds
and high angles of attack,
low-visibility in the optical, infrared and radar wavelengths;
-power take off and land using a shorter runway. Concerning
the implementation of the program, the report states that "the fall
of 2004 and finalized in November and December successfully carried
out preliminary design sewn front-line fighter of the fifth
generation I-21 before the commission of the customer. In
the final act of the commission, approved in December 2004, notes
issued by the project complies with the requirements, generally
approved approaches to the implementation of its design,
aerodynamics, flight and electronic systems and systems of
operation. Marked by a
high degree of elaboration of the project, received offers for its
deepening. As a result,
the decision to move to the next phase of the program. By
early 2005, conducted experiments on the part of flying
laboratories. In 2005,
the supposed protection of the technical design, execution ground
laboratory bench and field tests, verification of design solutions
in experiments with flying laboratories. The
main stages of further work on the project front-line fighter I-21
will be determined in accordance with the state armaments program
for 2006-2015.Simultaneously, work is underway on the preparation
and development of the Russian Air Force pilots piloting and combat
use of a multifunctional fifth generation fighter.
on the economic aspects of the program states that "funding
for the creation of front-line fighter of the fifth generation is at
both the state defense order in accordance with existing State
Armaments Program, so and at the expense of the company and
co-developers of the project. "
At the same time well aware that these tools alone are hardly
enough for the program on schedule (as we remember at the MAKS-2005
CEO of the company "Sukhoi" said the first flight prototype
fifth-generation fighter is scheduled for 2009 - more on this see
"The Rise» № 10/2005. p.9). To
raise additional funds necessary to intensify work on the program
guide, "Sukhoi" seriously considered the possibility of involvement
in the project for potential foreign partners. It's
no secret that one of the most probable of these partners was
considered to India.However, who visited in late November in Moscow
on an official visit to Indian Defense Minister Pranab Mukherjee,
alas, has dispelled the optimistic plans Sukhovsky leadership.
He said that fund the development of this aircraft is not
going to India. "Our air
force and manufacturing facilities in this area would like to
participate in all stages of the fifth generation fighter - starting
from concept and design, research and development to co-production,
including our financial participation." -
He said. Adding that to
do a simple export of finished vehicles in India are not interested. According
to the newspaper "Vedomosti", the Indian minister stressed that his
country needs aircraft lighter than developed "dry", and probably
single-engine. These are
the projects were presented Pranab Mukherjee during his visit to
another Russian company - the RAC "MiG", and according to some
reports, he became seriously interested in them. As
you know, the RAC "MiG", defeated the Russian Air Force in the
tender for the fifth-generation fighter program, though not turned
in this area, extending them to the initiative. Developed
"MiG" preliminary draft long-term light fighter are targeted
primarily for export, and may serve as a basis for a possible joint
Russian-Indian development. The
refusal of the Indian side to participate in the project "Dry", of
course, does not mean that it will not be extended to the Russian
Air Force.However, the volume of potential investments, which,
apparently, counted in "Dry", is now drastically reduced. In
most companies believe that the overall cost of developing a
promising fighter could reach about 1.5 billion dollars. (Taking
into account related programs to create a new engine, equipment and
weapons - to exceed five billion dollars.). With
the existing budget funding, even with the massive involvement of
their own developers, we can hardly expect this situation to the
fact that I-21 will be in service in the world market as quickly as
one might think.
12.2004
announced a
change in the TTZ, decided to reduce the maximum speed from 2.15M to
2M.Frozen level of performance, the first flight postponed to 2009,
mass production - in 2015. There
was a failure of the Indian side to participate in the project.
... Vladimir Mikhailov said that the reduced number of 0.15
"M" specified in the tactical and technical characteristics of the
job rate of the new aircraft. "
"For example, given a description of 2.15 M that the aircraft
was flying at such a rate, but the number - 0.15 implies the need to
strengthen the hull, an increase in weight of the aircraft, "- said
the commander in chief.
According to him, "Analysis of aircraft such as the Su-27 and
MiG-31 has shown that these aircraft, although able to walk around
at these speeds, but they rarely go out. "
"Fixed just a few test pilots flying at such speeds, this
implies that hundreds of problematic issues to strengthen the tail
and has a bad effect on other characteristics of the aircraft," -
Mikhailov said. 2005.
Sukhoi Design
Bureau has continued to develop long-term aviation system. Designed
and prepared for presentation to the state customer engineering
design and technical projects for a fighter its components, layout
in electronic form, produced and is working off a working model of
the cab. On a flying
laboratory tests of upgraded engines, ready for test flying
laboratory for an integrated management system, continued flight
experiments on the flying laboratory Su-47.Funding for a combat
aircraft is a new generation from the state defense order in
accordance with the state program of armaments, and the expense of
the Company and co-developers of the project. The
first stage of negotiations with a foreign partner for its
participation in the program (subject I-21E.) announced
that the entire complex of works on creation of the T-50 will cost $
5 billion. Under the
theme of "Demon" NPO "Saturn" is developing engine AL- 41F1
(izd.117A, izd.117S) the so-called first phase of a thrust vector
control (CET) and the thrust of 14000 - 14 500 kg, the engine of the
second stage will be equipped with a new compressor and a nozzle
with a thrust reverser. Thrust
will be 15 300 - 15500 kg. 2006
In 2006, the
scheduled completion of the development, presentation and protection
of the next phase of the project and its components. In
the "Novosibirsk Aircraft Production Association.VP Chkalov
"are preparing the program of the complex I-21. Program
to develop a set of I-21 and a family of Russian regional aircraft
RRJ are national priority programs in the aircraft industry and
government support are provided. Principal
amount of research carried out by JSC "Sukhoi", falls on military
aircraft programs - 74.8%, and almost half of this amount (36.7%) -
R & D related to the development of a set of I-21. ...
"airframe defined, evacuated (in TsAGI wind tunnel - "IF-AVN"), the
characteristics of reconciled ". ...
According to him, the Russian Air Force will order more as a light
aircraft of the fifth generation. "Meanwhile,
we will do more than light aircraft, perhaps, with one engine ", -
said Vladimir Mikhailov. According
to him, is not always advisable to have a park only heavy aircraft,
which can, for example, carry 12 missiles."difficult to imagine that
all the missiles, he (the pilot -" IF-AVN ") uses, will bring down
12 enemy aircraft. It's better to be 4 or even 2 missiles, but he
uses them both - that's enough" - said Vladimir Mikhailov. According
to the commander in chief, the cost and weight of the new aircraft
is less than that is of great value. Mikhailov
said that the sketch of the new fifth-generation aircraft could soon
be made public. 23.08.2008.
Fifth-generation fighter in Russia is planned to create two classes
- the heavy and light, said Air Force Commander Gen. Vladimir
Mikhailov.
"We are developing a fifth generation aircraft in two
directions at the company" Dry "and Corporation" MIG ". On the basis
of" dry "will be a heavy version of the fighter, the "MIG" - a
light, "- said Vladimir Mikhailov on Wednesday at a meeting in
Moscow with the Finnish Air Force Commander Heikki Lyuyutinenom.
According to "Interfax-AVN," Assistant Air Force Commander,
Colonel Alexander Drobyshevsky, at a meeting Mikhailov also noted
that the heavy fighter version of the plan to establish 12 points of
suspension for a variety of weapons, with light - four.
Mikhailov said that the weight of a heavy version of the fifth
generation fighter will be 30 tons of light - 14 tons.
"Avionics for Aircraft being developed of "dry" and
corporations "MIG" will be the same, which will reduce the cost of
production ", - quotes the assistant commander Alexander
Drobyshevsky.
were working to bring the Indian side to participate in the
project: ... A good
example of cooperation provides a sound basis for implementing the
joint development and production of next-generation fighter. During
Putin's visit to Delhi define the contours of cooperation between
our countries and for this project. Here,
as a parent company with the Russian side was chosen "dry". Also,
it was determined that the new aircraft will be designed not to
scratch, "from scratch", as suggested by some experts. Instead,
the basis of a backlog created by the company "Sukhoi" while working
on the PAK FA project. Although
initially heard the objections, they gradually disappeared as dating
potential partners with the state of affairs on the PAK FA. In
the end, the Indian side recognized that the approaches that have
been laid "dry" in the PAK FA is fully compliant with international
requirements for advanced combat complexes next generation.This
decision was logical. As
it turned out during the meetings of experts of two countries in
2005-2006., Views the Russian Air Force and Indian Air Force on how
the aircraft should be the next generation, were very close. Therefore,
it makes no sense to discard achievements already made by the PAK
FA, for the sake of "full equality" of participants in the overall
project from the very beginning of its implementation. "With
the phased implementation of the program can gradually reach the
ratio of 50 to 50, - told reporters CEO AHK" Sukhoi "Mikhail
Pogosyan - today it makes no sense to discard groundwork done." Dry
"just not interested in this approach." As
the history of the project development of the Su-27 heavy fighter
program lasts for decades. Development
of the Su-27 began in the early '70s, and the production of
"advanced" version of the aircraft - the Su-30MKI fighters - will
support up to 2015 Series next-generation fighter program promises
to be no less durable. With
the adoption of the Indian side brushed PAK FA as basis for the
joint program has been possible to discuss a very high degree of
unification of the Indian and Russian versions of the base plane to
the requirements of a particular customer. This
is a degree of harmonization in the 90-95%. That
is, the differences are only possible in some on-board systems. Given
the increase in the total number of the production program cost per
car is significantly reduced, and the risks are reduced. One
of the critical technologies that will bring together the required
level, technology is the active phased array antennas (APAA) for
airborne radar. "This is
a critical technology that must develop in our country", - said
Mikhail Pogosyan. Developer
AFAR was previously selected on the basis of the tender held by the
company "Sukhoi" with the Defense Ministry. It
turned out that the existing backlogs on the subject is isolated on
the role of leader formed cooperatives NIIP them. VVTikhomirov. By
adopting a policy decision to develop a radar with active phased
array on the PAK FA, "Dry" is not going to leave work for a passive
phased array antennas. The
analysis showed that by increasing the transmitter power and the
implementation of other measures can increase the detection range of
aerial target, "not for interest, and at times", - said Mikhail
Pogosyan. Therefore, the
passive phased array for a long time will remain on the aircraft
brand "Cy" the fourth generation. Their
replacement on active AFAR feasible only after 2010 in
the framework of the Su-35 PAK-FA and managed to create a framework
for improving the characteristics of the powerplant aircraft "Sukhoi". Last
year was a series of tests flying laboratory, where a deep
modernization of the variants of AL-31F Renew the thrust of 14.5
tonnes. The growth of
thrust will greatly improve maneuverability of aircraft like the
Su-27 (in particular, the steady-bend), and landing. In
the middle of this year the first prototype Su-35s will rise into
the air. On it will have
two pre-motor designed for flight tests. In
addition, created prototypes of a propulsion system for
next-generation aircraft. They
are working out at the flying laboratory will soon begin. 2007.
In March,
announced the beginning of construction of the first flying
prototype PAKFA. ...
Novosibirsk Aircraft Production Association (NAPO) Chkalov started
construction of a multifunctional fifth generation fighter. Work
is carried out in conjunction with aircraft factory in
Komsomolsk-on-Amur. This
was announced by the Director General of Fedor Zhdanov during a
visit to NAPO by the Governor of Novosibirsk region Viktor
Tolokonsky. "Finishing
the assembly will take place in Komsomolsk-on-Amur, and we will have
a fully assembled head of the aircraft," - said Zhdanov. Fifth
generation fighter aircraft which will replace the previous
generation MiG-29 and Su-27 design bureau developed a "Dry." joint
project with India on the basis of the T-50 was named MIT
(Prospective multi-role fighter.) Under
the plan the first flight of the Indian version in 2012, the series
in 2015. 2008.
NAPO refused
to work on a promising fighter in connection with the heavy workload
of production of the Su-34 and Su-24 upgrade. 15.04.2008. Russia
and Brazil have signed an agreement to jointly develop a fighter
aircraft and rockets for the satellite to Earth orbit. As
the Minister for Strategic Affairs Roberto Mangabeira Unger, Brazil,
Russia and Brazil plan to develop a fifth generation fighter that is
the most advanced to date, type of fighters, reports Associated
Press.
02/12/2009
Fifth-generation aircraft will begin test flights during 2009. Such
information to journalists on Thursday shared the head of the
company "Dry" and "MiG" Mikhail Pogosyan on aviavystavke in
Bangalore - the report said, "Interfax."
According to Pogosyan, "the amount of work that is performed,
allows for a year to begin testing of the airplane" . He
stressed that the development of the fighter continues. We
consider various options for the fifth generation aircraft,
including twin engine, as well as options for ship-based aircraft.
14.05.2009.
JSC
"Production - design association" heat exchanger "(PKO" heat
exchanger ", Nizhny Novgorod, Russia) will supply air conditioning
system (SCR) in the production of a new Russian fighter T-50. This
is stated in official documents of the company.
According to information, the aircraft developed Russian Air
Force and foreign customers for just planned to build 430 cars.
T-50 is equipped with 41 and 11 newly developed serial
products, the production of PKO "heat exchanger". In 2008, the
number of items included in the SLE T-50, were preliminary and
endurance tests, produced a set of aggregates for preliminary
testing of the system.
T-50 - a promising aviation complex tactical aircraft - the
Russian fifth generation fighter aircraft being developed by the
KLA. The lead developer is JSC Sukhoi, where he received the
designation T-50. aircraft designed to replace the MiG-29 and Su-
27. The first flight of the PAK FA scheduled for summer 2009. Series
production aircraft is scheduled for 2010. 15/07/2009.
Fifth-generation fighter will be produced about 1,000 units, said
korr.ARMS-TASS at the salon, "Farnborough 2008," CEO of "Sukhoi"
Mikhail Pogosyan.
In his words, "mass production of fifth generation fighter is
scheduled to begin in 2015, and production program for their
production will continue for at least 40 years - until the 2055-2060
years. that is a very real term. "
As evidence of these calculations Pogosyan gave the example of
the production program of aircraft production Su-27/Su-30/Su-35
family. Su-27 production
started in the late 1970s. The
Su-30MKI will be produced in India under license for another five
years. Interim Su-35 4 +
+ generation will allow to extend the product range of this family
until 2020. In general,
to this moment in this family of aircraft will be produced about
1000.
"That is, this line of aircraft will be produced for 40 years,
although the aircraft registration 1980. and in 2020 will be
different" as heaven from earth, "- said M . Pogosyan.
In this case, according to M. Pogosyan, "We believe the
production of the Su-35 a very important step, since the Su-35 as an
intermediate model 4 + + generation will be introduced, many studies
for the fifth-generation fighter, which further significantly reduce
the risks in their production. "
-----------
The project is the fifth generation
aircraft was defended Russia's air force technical layout. This
was April 6, 2007 said Acting Chief of Air Force Colonel General
Alexander Zelin said the Russian. He
noted that the timing of order fulfillment and customer solution
(Ministry of Defense) do not change. "In
the time before 2009. We fit," - said Alexander Zelin said.
Airplane
promising aviation complex tactical aviation is a further
development of the most advanced in terms of aerodynamic layout of
the fighter-interceptor fourth-generation Su-27.Record glide past,
reaching 8.11 should be linked with a reduced ESR, the internal
suspension of weapons and supersonic cruising.
As the
prototype is chosen layout T10/12 1974 not carried out due to time
constraints during the creation of the Su-27.
According to
information, the aircraft is being developed for the Russian Air
Force and foreign customers for just planned to build 430 cars.
T-50 is equipped with 41 and 11 newly developed serial
products, the production of PKO "heat exchanger". In
2008, the number of items included in the SLE T-50, were preliminary
and endurance tests, produced a set of aggregates for preliminary
testing of the system.
"You have
already assessed the needs of the Air Force in a new car?
While we order from one industry squadron. then determine the
number depending on the range of challenges facing us.
And what it could be the problem?
New aircraft must be involved in the defense of the country,
used to other tasks. Depending on the threats we retool our air of
the army. I think that first of all re-arming can touch the
regiments in the Far East and the North Caucasus Military District "
The plane
will be inscribed in a single information system of battle - he
stressed. In practice,
this means that control the "Five", adjust the action a pilot and
aviation complex will be able to redirect not only from the command
posts, but, for example, a reconnaissance vehicles to the
battlefield. Transmit the
information to help board satellite system GLONASS. Unique
weaponry aircraft is approximately five times increase its combat
effectiveness.
---------- EA
Fedosov - Director of the
Research Institute of Aviation Systems of
PAK FA
... But for Russia the situation is very clear. F-35
aircraft from 2010-2012, will begin to displace our aircraft from
the market of military aviation, if we fail to oppose the
development of their specific fifth-generation aircraft.
For us, loss of market of military aviation would mean the
decline of the Russian aviation industry.I have already dwelt on the
fact that we lost the world market of civil aviation, and to return
to this market is almost impossible unless you go to work closely
with a "Boeing", or with EADS («Airbus Industrie") as a junior
partner. Even the
domestic civil aviation market is very difficult to maintain in the
active expansion of the same firms, especially if Russia becomes
more and at the World Trade Association (WTO). Russian
Air Force defense contracts so insignificant that it does not allow
to maintain the minimum industrial core, which is a kind of critical
mass of science, technology and the necessary volume of production. Only
the preservation of Russia on the world market of military aircraft
will maintain a critical mass of the aircraft industry. Thus,
for us to create a program of Russian military aircraft of the fifth
generation is the fateful task.
But not for all levels of leadership in the Defense Ministry
and the government clearly understand the evolving situation.
After many meetings and discussions of problems with the
institutions of the Air Force, with requisitioning management and
direction of military -Scientific Committee (INC), Air Force, we
have gradually come to a common understanding of the concept of the
aircraft. [391] The
complexity of decision making was related to the fact that the BBC
managers over the past ten years there have been significant staff
changes. To guide people
came who have not passed a school of modern combat aircraft, since
1984, after adopting a MiG-29 and Su-27s in Russia practically no
new development activities. Were
slight upgrade in the performance of export orders. Naturally,
under these conditions, there was no place to gain experience of
building a new plane. The
industry also have been significant changes in senior personnel
structure. Replaced the
heads of Yakovlev Design Bureau. AI
Mikoyan Design Bureau. PO
Sukhoi Design Bureau.Yakovlev, Director of TsAGI, CIAM, LII, VIAM.
Our institution had to bear unnecessary, more emotional than
technical discussions with the leadership of TsAGI. But
we are supported by general designers and managers of CIAM VA Skibin
and VIAM E. Kablov. In
the end, the concept was approved and declared a stage of
development of technical proposals. In
order to contest were Yakovlev Design Bureau. Mikoyan
and Yakovlev Design Bureau. Pavel
Sukhoi. Yakovlev Design
Bureau. Yakovlev worked
with the bureau and other parts of elaboration of the regime short
takeoff and vertical landing, although the need for the regime of
the Russian aircraft had not been apparent.
In early 2002, the National Competition Commission supported
the project Yakovlev Design Bureau. POSukhoy
as less risky and completely satisfying TTT.
In June 2002, this issue was discussed at the meeting and the
government, which approved the decision of the tender committee and
commissioned a comprehensive targeted program for further
construction of aircraft and move it to the schematic design.
Dramatically the situation with the Yakovlev Design Bureau. Mikoyan. General
Designer Nikolai Nikitin VF could not reconcile with the position
that the bureau lost the contest. He
believed that a mistake, and was not alone in this opinion. He
had supporters in the Air Force and to governmental agencies. Nikolai
Fedorovich followed the concept of the mixed fleet, which was
developed by our institute during the construction of another MiG-29
and Su-27. The presence
of "light" machine dimension MiG-29 creates, in his opinion, a more
favorable situation on world markets. As
a justification of their position they cited statistics of the world
fleet of light fighters.Indeed, the percentage of "light" fighters
(up to 15-17 tons), issued in the period 1970-1990, was much more
than "severe" (25-27 m). This
was due not so much a factor in the cost of the aircraft on the
market of military aviation, specifically how the current pattern of
larger issue at this time planes "light" dimension (in Russia -
MiG-29 in the U.S. - F-16, in Europe - "Mirage F-1" "Mirage 2000"). "Heavy"
aircraft were produced only to deal with air defense missions in
areas with poor terrestrial infrastructure and a sparse network of
airfields. In the U.S.,
this plane was the F-15, which was placed on the ground in Alaska. In
Russia, for this purpose was created the MiG-31. The
Su-27 was built on the concept of escort fighter attack aircraft. He
also got into the class of "heavy" and could be used as an
interceptor in the air defense systems. It
was in this capacity, expressed an interest to him, India and China. But
in the XXI century. As I have repeatedly pointed out, has changed
the political situation. There
was a demand for the aircraft "average" weight category (20-23 m) to
be more consistent with the concept multipurpose aircraft. So
bear market statistics of the second half of XX century in the first
half of the XXI century, at least, is incorrect. I
in general understand the concern was general designer of
OKB.Mikoyan. The country
has the opportunity to build just one aircraft, and the fallout from
the process of building this aircraft MiG world famous firm may lead
to its degradation.
Here the dramatic situation is not unique to Russia. Established
strong school of designers during World War II and the Cold War has
always been in demand as there was a fairly well developed type of
combat aircraft for various purposes, and all missed work. But
the last decade changed the situation. Added
aircraft fell sharply, so give everyone an opportunity to design
office building aircraft from start to finish is not realistic. Incidentally,
this is one of the factors that caused the integration of aviation
companies in the West.
The first victim of the current situation was Yakovlev Design
Bureau. A. Yakovlev. After
we closed orders for aircraft vertical takeoff and landing of the
second generation of Yak-41 and aircraft carrier-based radar picket
Yak-44, DB is left in the last decade, without defense themes.Ten
years - a long time. Save
group failed. Of course,
it would be a tragic mistake to allow such a finale for the Yakovlev
Design Bureau. Mikoyan. The
only correct solution would be to unite with the Yakovlev Design
Bureau. Pavel Sukhoi in
the construction of the fifth generation aircraft.[393] In fact, in
the U.S. construction of F-35 is three companies ("Lockheed Martin",
"Northrop Grumman", "BT Systems"), each of which in his time
exclusively built aircraft from start to finish.But life has forced
them to unite. As the
experience of co-construction of these companies away, they agreed
to divide the airframe into three parts and using the methods of
machine design and CALS-technologies, create a virtual design a
glider.
This was a unified information database and a single software
process, software auto computer design. Interaction
with the bank data is deleted from the job of designers who are at
firms with the technical means of interaction and information
exchange formats established. In
fact, they work in a format a single virtual enterprise. Why
do not we use this methodology? I'm
pretty sure that we come to this, but this would require "political
will" leaders. It is
necessary for both EDB.Although the Yakovlev Design Bureau. Pavel
Sukhoi, which won the competition, has the best domestic economic
situation and a team-preserved, thanks to enough volume export
orders, but it alone will not be able to master such a difficult
order, especially in the organization of work on the functional
aggregation, fine-tuning and testing. In
these directions the experts are worth their weight in gold, and few
of them.
One of the most difficult issues to be addressed during the
construction of the fifth generation aircraft - a necessary amount
of funding request. The
fact is that when it was finally decided to set up an aircraft, a
program of building weapons for the planned period was already up
and running and approved, and it is not enough consideration of
relevant resources. Therefore,
talking about raising funds from the export of fighter planes - the
so-called extra-budgetary funding. For
western big concerns is the current practice, but in Russia such an
experience finance is still not there. Yes,
and such large-scale corporations, which are available in the West,
in Russia there is none. It
is necessary to collect payments from export earnings from all
co-operatives, which is involved in exports. But
for this there is no legal basis.
I'm pretty pessimistic about the situation. Organize
extra-budgetary funding is not possible, but it creates also
problems related to intellectual property. Typically,
development is financed from the state budget, and intellectual
property as a result of state-owned. If,
however, will be present and the extrabudgetary component, then deal
with the membership of this property will be difficult.The only
correct solution would be to continue the preliminary design the
aircraft, which means in defense orders are available, and
subsequently corrected to weapons programs. It
will still have to do - make life as weapons program still contains
a lot of "moles" "cold war."
inhibit the development of aircraft now - means to lose the
market of military aviation. Replaced
in 2002, Air Force leadership was very difficult legacy. Ten
years of combat aircraft fleet has not been updated and requires
modernization. Therefore,
for the Air Force Commander Colonel General Vladimir Mikhailov SA
now in first place the task of extending the life of the fleet
structure and modernization of aircraft to meet new requirements. Tactically,
he can not do otherwise, so for him and his deputy on weapons is a
problem of optimal allocation of scarce resources to the
modernization and construction of fifth generation aircraft. The
problem, in general, not easy. As
chief, he is responsible for the readiness of the Air Force. Fifth-generation
aircraft will be supplied to troops before 2015, which means the
current fleet of Air Force must ensure its combat readiness, at
least until 2020.
For the aviation industry, of course, the priority is to build
a new plane. There is a
typical conflict between the Air Force and industry. That's
where the missing special governance structure that existed in the
form of the Military-Industrial Commission to the Council of
Ministers!
Anyway, as said our well-known leader in the recent past, "the
process has begun." We
started the construction of the fifth generation aircraft. We
are in the beginning. We
have to solve the daunting task: to develop an entirely new
electronic systems with high-technology solid-state electronics for
antenna - active phased array, to form a multi-processor computing
environment on board an aircraft with very high efficiency, to
develop fundamentally new optoelectronic systems and precision
weapons of new generation.
In parallel with the construction Plane problems must be
solved to provide information to intelligence information, the
flight plan for aircraft and weapons training system for pilots and
maintenance personnel, logistics system operation, etc. [395] It is
very important, perhaps decisive will be the creation of situational
awareness systems (total coverage picture of developments in the
tactical zone of joint action group of aircraft), the identification
of targets (guaranteed to identify all targets in the tactical zone
of joint action group of aircraft), the tactics and methods of
combat employment, including the timely consideration of all the
changes that occur during combat missions, implemented by various
actors joint combat operations.
To manage the development of fifth generation aircraft
programs will need to master new computer technologies associated
with the widespread introduction of simulation, CAD,
CALS-technologies in various stages of the life cycle of a plane,
organizational and technical management in the format of a "virtual"
enterprise and etc. The program of the new aircraft should be very
closely aligned with the "National Technological Base", which, in
essence, and this created. Work
on the plane to attract fresh young forces of the graduates of the
MAI, Moscow State Technical University, MATI, MIPT, MIREA and other
higher education institutions.
All the processes of integration and the reform of the
aviation industry will have a real base.Industry, Ministry of
Defense and the main branches of the armed forces will have wide
experience of joint co-operation during the first post-Cold War
development of complex weapons system based on extensive use of
modern technology as a mathematical simulation of complex
organizational and technical systems.
Concluding memories about the past fifty years in my memory
the way our Aviation, I am full of hope that Russia will remain as a
great aviation power, and that for many years to the sky of our
country and the air spaces around the world will surf the aircraft,
built thanks to the hard but honorable work of our aircraft
manufacturers.
---------
On the basis
of published material on the program PAKFA can be assumed that the
basis of aerodynamic layout of the T-50 went to one of the schemes
considered during the development of T-10 (Su-27).
excerpt from the book "Su-27, the beginning of history"
LAYOUT T10/12 (October-November 1974)
The appearance of the layout is the result: on one hand -
dissatisfaction with the outcomes of the design scheme of
axisymmetric air intake (T10-10), on the other hand - the desire to
try to realize the "armpit" configuration (ie location of the air
intakes of a-la "Rafale" - paralay ) a new technical solution in the
form of retraction scheme back to the tail boom, previously tested
at T10/11.
Thus, at the end of 1974, the team continued to search for new
100-3 technical solutions for the "underarm" scheme. Designing
a new version of the layout, identified as "12 editorial," The Su-27
(T10/12) led the JV Davydov,
under his leadership worked VS Prisyajnyuk and V. Shmelev. But
soon after the start of Disagreement designers views on the
aerodynamic and structural and layout design of the scheme. As
a result, become parallel to consider two options once the layout
T10/12. The first design
drawings completed VS Prisyajnyuk, Oct. 23 N. Dubinin approved its
version of the "assembly scheme." November
30 VY Shmelev signed in NS Chernyakova "General view of the
aircraft."
In general, both of which had much in common. A
common characteristic feature of "armpit" scheme was "lowering" the
level of the fuselage relative to the plane of the wing chord. Given
the much smaller (only 1.8 m) than the integrated versions of the
layout, spacing of the axes of engines, the fuselage in the middle
of his symptoms soon acquired a "detached" than the integral
version. It is therefore
very important role was played by the choice constructive power
circuit fuselage. In this
regard, it is interesting to note that at T10/12 abandoned the
traditional version of the center section, under which "hung up" the
remaining elements of the design. The
power circuit of the fuselage T10/12 medium was largely "borrowed"
from the F-15 Photo frames, and other fragments of the fuselage,
which had already been published in the press. In
this scheme, the upper and lower belt cover frames and reduced air
channels inside the landing gear fairings to the building heights
wing panels. Junction
with the center-wing panels was put on the outer side fairings, the
distance Z = ± 2,3 m.
Another hallmark of T10/12 was a return to the rectangular air
intakes, with the upper wedge brake. Thus,
we can say that the option T10/12 was a direct descendant of the
scheme T10 / 4, but in a slightly larger dimension and a higher
technical level of detail. Therefore,
the problems encountered, were similar to those faced by the T10 /
4. This concerned, above
all, the integration of the rectangular air intakes to the fuselage. To
drain the boundary layer to the side of the fuselage at T10/12 used
a profiled vertical slit in influx and discharge of a wedge between
the lateral surface of the fuselage and air intake, and on the lower
surface of the influx of dumped boundary layer through a horizontal
slit in a profiled influx - and also on its upper surface.According
to the recommendations of aerodynamics, to work out the figures
showed a new routine to the projection of an influx of form.
the same for both options and chose the scheme cleaning the
main landing gear - the movement back, with accommodation in the
tail section of the beams increased, ie, analogous
to the "Odessa" variant of the layout T10/11. The
difference is in the arrangement of beams in the tail area for the
main landing wheel recess. Option
Prysyazhnyuk by allowing the beams and vertical tail fins all-moving
fins with oblique axis of rotation, and in the version installed on
the beams Shmeleva only horizontal tail with a straight axis, and
the keels were placed on the nacelle, with the collapse of an angle
of 15 ° outwards. In this
regard, the tail joists in the form Shmelev had a lower end portion
of the width and cross-sectional area, but had to endure GO drives
on top of the bars and hide them under a special fairing. In
the embodiment Prysyazhnyuk tail boom had a much thicker, and
acceptable to the organization at the corners vanishing zakontsovkah
beams had to organize a fairly long stekatel - the so-called
"flippers". But the drive
is placed inside the stabilizer beams themselves.
Otherwise, the differences between both versions of the scheme
were small and were reduced to a purely constructive. For
example, in both cases, the front landing gear was retracted
forward, against the flow, but in the version Prysyazhnyuk it was
attached to the rear of the cab and was removed in podkabinny
compartment, and in the embodiment Shmelev - was attached to the
frames and the force was removed in zakabinny compartment. As
a result, in the embodiment Prysyazhnyuk chassis base was 1.3 m
higher than that of Shmelev.
In principle, one could say that the plane had "turned." Of
course, for there T10/12 "weakly"-designed space. One
of these elements, as in the embodiment T10/11, was the design of
tail beams, in addition, poorly understood for this version of the
layout were the organization of the slits around the drain inlet. However,
there was no doubt that at the proper level refinement elements,
this version (as well as some other alternative schemes) could well
bring to the working draft. To
do this, not only wanted one thing - time. Over
the management of projects still prevailed turnaround time - nearing
the end of 1974, when, according to the schedule, it was necessary
to finalize the selection of options for the detailed design stage. As
a result, work on the T10/12 end of the year have been curtailed. Scavenging
model for it is not built, that is not possible to determine the
real advantages (or disadvantages) of this scheme. Thus,
the creation of the layout T10/12 was, in fact, the last stage of
prospecting in the department projects at the stage of elaboration
predeskiznoy aircraft.
Information from "stealth car" can be
used by you without restriction, provided a link